It has been quite a while since I have updated the blog about The Buckeye. We’ve been moving right along and made great progress through the winter. Now, we’ll finish it up in time for lemonade sipping on the back porch for summer!
We left off as the walls were being poured. Next up was framing.
Heading down to the basement.
We worked on the outside as well – between snow storms!
Front of the house
This is the rear porch.
Next up comes the brick.
And, the rear view. On a side note, the bike path for this community runs right out their back door!
Now, moving back inside, the drywall is hung! This is looking into the kitchen and seeing the front side of the island.
This is the view from the kitchen sink into the great room and front entry.
Another view of the great room and especially, the fireplace.
Check out all of the natural light in the great room and kitchen!
Doors, trim and paint is up next. Here is the front entryway.
And, the same view of the light in the great room, but now it’s primed.
And, looking back into the kitchen.
And, now for the fun part. The finishes! First, we worked on jazzing up the fireplace with built in shelving on either side.
Then, the kitchen cabinets.
And, then, most recently, the exterior received a coat of paint! It also received a Joyner Homes sign for the front yard.
More photos to follow as more exciting finishes are installed – flooring, counter tops and much more!
YOU MIGHT ALSO LIKE
CATEGORIES
- completed homes (27)
- custom homes (17)
- faq (17)
- build on your lot (15)
- jh communities (14)
- homeowner tips (11)
- homes for sale (8)
- design-build (5)
- the bedford (5)
- jh team (3)
- the aspen (3)
- the dakota (3)
- design studio (2)
- jh black (2)
- the addison (2)
- the denali (2)
- the flatrock (2)
- the nantucket (2)
- the rockford (2)
- the camden (1)
- the cypress (1)
- the everton (1)
- the highlands (1)
- the juniper (1)